A confidential spice blend manufacturer sought to build and operate a new dry mixing and packaging plant in California and selected a developer designed and built spec building of roughly 62,000 square feet.
Epstein provided architecture and structural, process, and MEP/FP engineering for new enclosed rooms in the center of the spec building to provide space for their specialty blending and packaging equipment, as well as rooms for electrical equipment and dust collectors.
There were several critical items that Epstein coordinated with the developers design team including the location and loads for walk-on ceilings, location and loads for roof top HVAC equipment, and underground sewer location and depth.